The Voice of the Mountain Resort Industry  |  Est. 1962

New Jackson Tram Comes Online

SAM Magazine – Teton Village, Wyo., December 15, 2008 – Jackson’s new tram is scheduled to open on December 19. The new tram replaces the original red boxes that were an iconic symbol of the Wyoming ski resort. Built by…

SAM Magazine – Teton Village, Wyo., December 15, 2008 – Jackson’s new tram is scheduled to open on December 19. The new tram replaces the original red boxes that were an iconic symbol of the Wyoming ski resort. Built by Doppelmayr/CTEC, the new lift has double the capacity – 100 people – per box versus the old tram and travels 4,139 vertical feet in 9 minutes. The two-year construction process has been fully documented by the ski area, with words, photos and additional information available at www.tramformation.com.

About the Author